Simulasi Operasi Konstruksi Pekerjaan Beton Pada Proyek Hotel Dafam Kayon Surabaya Menggunakan Cyclone

Darmawan, Rahmat Ridho (2018) Simulasi Operasi Konstruksi Pekerjaan Beton Pada Proyek Hotel Dafam Kayon Surabaya Menggunakan Cyclone. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3114105033-Undergraduate_Theses.pdf]
Preview
Text
3114105033-Undergraduate_Theses.pdf - Accepted Version

Download (3MB) | Preview

Abstract

Dalam sebuah pembangunan konstruksi, seringkali ditemukan berbagai masalah. Salah satu permasalahan yang sering ditemukan dalam proyek konstruksi di Indonesia adalah kurangnya pengetahuan dalam perencanaan operasi konstruksi yang mengakibatkan keterlambatan kegiatan konstruksi dan tidak optimalnya sumber daya yang digunakan. Cara untuk mengantisipasi permasalahan dalam masalah efisiensi yang akan terjadi dalam fase pelaksanaan adalah dengan simulasi. Simulasi yang digunakan pada Tugas Akhir ini adalah metode simulasi Cyclone (Cyclic Operations Network) yang merupakan teknik pemodelan yang memungkinkan representasi grafis dan simulasi sistem diskrit yang berhubungan dengan variabel deterministik atau stokastik.
Simulasi ini diaplikasikan pada proyek Hotel Dafam yang berlokasi di Jl. Kayon, Surabaya. Sebelum memulai simulasi, dilakukan pengumpulan data dan melakukan studi literatur untuk mempelajari lebih lanjut mengenai simulasi operasi konstruksi dan WebCyclone. Lalu dilakukan pemetaan proses pelaksanaan yang menjelaskan tentang urutan pekerjaan dalam pembangunan gedung ini untuk dilanjutkan dengan perhitungan produktivitas masing-masing pekerjaan tersebut. Setelah mendapatkan produktivitas dari masing-masing pekerjaan, dilakukakan penyusunan model simulasi konstruksi yang selanjutnya diikuti dengan pembuatan coding untuk dimasukkan ke program WebCyclone. Tahap akhir dari simulasi ini adalah analisa sensitivitas yang merupakan optimalisasi dari hasil output WebCyclone.
Dari hasil output WebCyclone didapatkan nilai produktivitas dan idle time tiap sumber daya. Hasil yang diharapkan dari simulasi ini adalah menghasilkan durasi waktu pelaksanaan konstruksi yang optimal dan meminimalisir idle time alat berat. Hasil akhir dari simulasi Webcyclone ini menunjukkan produktifitas yang optimal pada proyek Hotel Dafam Kayon adalah sebesar 0,002303 siklus per jam atau sekitar 44 hari kerja untuk menyelesaikan satu siklus. Dimana satu siklus merupakan proses pekerjaan beton per satu lantai. Hotel Dafam Kayon Surabaya memiliki 16 lantai, oleh karena itu, membutuhkan waktu 704 hari kerja atau 23,5 bulan untuk menyelesaikan struktur beton proyek ini.
====================================================================================================================
In a construction, it has various problems oftentimes. One of the problems often found in construction in Indonesia is the lack of knowledge in designing construction operation that causes retardation of construction process and the used sources are not maximum. The way to anticipate efficiency problem that will occur in processing phase is simulation. Simulation used in this final project was cyclone (cyclic operation network) simulation which is modeling technique. It allows graphic representative and simulation of discrete system that related to deterministic variable or stochastic.
This simulation was applied to Dafam Hotel project located on Jl. Kayon, Surabaya. Before starting the simulation, it was conducted collecting the data and literature study to learn more about simulation of construction operation and WebCyclone. Furthermore, it was done mapping of implementation process that explains about the work sequence in building the hall to continue with calculation of productivity in each work. After obtaining the productivity, it was conducted arrangement construction simulation model then it was followed by making coding to enter Webcyclone program. The last step in this simulation was sensitivity analysis or optimization from output result of webcyclone.
Webcyclone resulted productivity value and idle time in each source. The expected result of the simulation is obtaining optimum time duration of construction process and minimizing idle time of heavy equipment. The last result of webcyclone simulation showed that optimum productivity of Dafam Kayon Hotel was 0.002303 cycle per hour or about 44 work days to complete one cycle in which a cycle is concrete work process per floor. Dafam Hotel Kayon Surabaya has16 floors, therefore, it needs 704 work days or 23,5 moths to complete concrete structure of the project.

Item Type: Thesis (Undergraduate)
Additional Information: RSS 624.183 4 Dar s-1 3100018075068
Uncontrolled Keywords: Idle Time; Operasi Konstruksi; Simulasi; WebCyclone; Construction Operation; Simulation; WebCyclone
Subjects: T Technology > T Technology (General) > T56.8 Project Management
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Rahmat Ridho Darmawan
Date Deposited: 25 Jan 2018 03:11
Last Modified: 16 Sep 2020 06:43
URI: http://repository.its.ac.id/id/eprint/50515

Actions (login required)

View Item View Item