Perhitungan Waktu Dan Biaya Pelaksanaan Pekerjaan Struktur Pada Gedung Hotel Namira Surabaya Menggunakan Metode Half Slab Precast

Ramadhani, Adinda Puspita (2019) Perhitungan Waktu Dan Biaya Pelaksanaan Pekerjaan Struktur Pada Gedung Hotel Namira Surabaya Menggunakan Metode Half Slab Precast. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111815000017-Undergraduate_Theses_.pdf]
Preview
Text
10111815000017-Undergraduate_Theses_.pdf

Download (42MB) | Preview

Abstract

Gedung Hotel Namira Surabaya dengan luas bangunan 4649 m2, memiliki 10 (sepuluh) lantai dengan struktur pondasi tiang pancang serta struktur atas menggunakan beton bertulang. Metode pelaksanaan yang digunakan dalam pembangunan Gedung Hotel Namira Surabaya adalah dengan metode cast in-situ. Dengan metode tersebut, pekerjaan beton dilaksanakan secara konvensional. Sedangkan metode pelaksanaan yang digunakan dalam penyusunan tugas akhir adalah dengan metode precast.
Biaya pelaksanaan dihitung berdasarkan analisa yang sesuai antara literatur yang digunakan maupun peraturan yang berlaku untuk mendapatkan kesesuaian dengan kondisi pelaksanaan lapangan. Sedangkan pada perhitungan waktu pelaksanaan dilakukan analisa mulai dari kapasitas produksi, produktivitas, durasi dan penyusunan jadwal setiap pekerjaan dimana hal ini dilakukan dengan menggunakan alat bantu Microsoft Project. Dari hasil analisa perhitungan tersebut diketahui waktu pelaksanaan proyek tersebut dengan total biaya pelaksanaan pada Gedung Hotel Namira Surabaya dengan menggunakan half slab precast. Dari hasil analisa perhitungan diketahui waktu pelaksanaan proyek tersebut menggunakan metode half slab precast adalah 6 bulan 14 hari atau 194 hari dengan total biaya pelaksanaan sebesar Rp16.030.669.000,00 (Enam Belas Milyar Tiga Puluh Juta Enam Ratus Enam Puluh Sembilan Ribu Rupiah), sedangkan waktu pelaksanaan proyek tersebut dengan metode konvensional adalah 8 bulan 21 hari atau 261 hari dengan total biaya pelaksanaan sebesar Rp9.469.546.000,00 (Sembilan Milyar Empat Ratus Enam Puluh Sembilan Juta Lima Ratus Empat Puluh Enam Ribu Rupiah).
=================================================================================================================================
Namira Hotel Surabaya with a building area of 4649 m2, has 10 (ten) floors with a spun pile foundation on the bottom structure and upper structure using reinforced concrete. The implementation method used in the construction of the Namira Hotel Surabaya is the cast in-situ method. With this method, concrete work is carried out conventionally. While the implementation method used in the preparation of the final task is the precast method. Implementation costs are calculated based on the appropriate analysis between the literature used and the applicable regulations to get conformity with the conditions of field implementation. While the calculation of the implementation time is analyzed starting from the production capacity, productivity, duration and scheduling of each job where this is done by using Microsoft Project tools. From the results of the analysis of the calculation, it is known that the implementation time of the project with the total implementation costs in the Namira Hotel Surabaya using half slab precast. From the results of the calculation analysis, it is known that the implementation time of the project is 6 months 14 days or 194 days with a total implementation cost of Rp16.030.669.000,00 (Sixteen Billion Thirty Million Six Hundred Sixty Nine Thousand Rupiahs), while the project implementation time with conventional methods is 8 months 21 days or 261 days with a total implementation cost of Rp9,469,546,000.00 (Nine Billion Four Hundreds Sixty Nine Million Five Hundred Forty Six Thousand Rupiahs).

Item Type: Thesis (Diploma)
Additional Information: RSIS 692.5 Ram p-1 2019
Uncontrolled Keywords: plat precast half slab, biaya pelaksanaan, waktu pelaksanaan proyek.
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA683 Precast concrete construction. Prestressed concrete construction.
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Adinda Puspita Ramadhani
Date Deposited: 06 Mar 2024 07:40
Last Modified: 06 Mar 2024 07:40
URI: http://repository.its.ac.id/id/eprint/64635

Actions (login required)

View Item View Item