Estimasi Biaya Dan Waktu Serta Metode Pelaksanaan Proyek Rehabilitasi Waduk Muara Nusa Dua Kota Denpasar, Bali

Firmansyah, Muhammad Agha (2020) Estimasi Biaya Dan Waktu Serta Metode Pelaksanaan Proyek Rehabilitasi Waduk Muara Nusa Dua Kota Denpasar, Bali. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[img] Text
10111500000118-Non_Degree.pdf - Accepted Version
Restricted to Repository staff only

Download (25MB) | Request a copy

Abstract

Waduk muara nusa dua yang terletak di kota Denpasar, Bali merupakan salah satu tempat yang memiliki arti penting bagi masyarakat kota Denpasar. Pasalnya , tujuh sumgai yang berada dipulau dewata bermuara diwaduk ini. Kebutuhan sumber daya air dirasakan meningkat, karena terjadi peningkatan pertumbuhan penduduk dan industri, khususnya diprovinsi bali yang merupakan daerah dengan peningkatan industri yang tajam. Tujuan dibangunnya waduk muara nusa dua adalah untuk memanfaatkan sumber daya air baku , dan upaya pengembangannya untuk optimalisasi pemenuhan kebutuhan air bersih, menampung limpasan air hujan dari daerah pengairan sungai yang terbuang ke laut setiap waktu sebagai pengendalian banjir. Suatu pekerjaan teknik sipil, perlu adanya metode palaksanaan pekerjaan suatu proyek. Demikian juga padaii perkerjaan proyek Waduk Muara Nusa Dua Bali, sangat perlu adanya metode pelaksanaan yang tepat agar proyek tersebut mendapatkan hasil yang sesuai dengan yang direncanakan. Dalam pelaksanaan pekerjaan Waduk Muara Nusa Dua Bali ada beberapa pekerjaan yang kami anggap tidak efisien sehingga penulis memutuskun untuk menggunakan alat Vibratory pile driver dan Mobile truck crane agar pekerjaan proyek tersebut lebih efisien. ======================================================================Muara Nusa Dua Reservoir which is located in Denpasar, Bali is one of the important and meaningful places for people in Denpasar. It is mainly because there are seven rivers of the Dewata Island (Bali) which are all located in this reservoir. The necessity of water resource is increasing due to the increase of the industrial and population growth, especially in the province of Bali which is an area with a significant number of industrial growth. The purpose of constructing this reservoir Muara Nusa Dua is to utilize the raw water resource and also the effort to develop a more optimize clean water resource’s necessity, to accommodate rainwater from a river irrigation area which always streams away to the ocean as a means of flood control.iv In a civil engineering job, there needs to be an implementation method of project execution. In the project execution of Muara Nusa Dua reservoir, there also needs to be a precise method execution in order to obtain a corresponding result as planned. In this Muara Nusa Dua reservoir work execution, there are some works that are considered as inefficient which lead the writer to finally decide to use the Vibratory Pile Driver and Mobile Truck Crane in order to make the project execution works more efficiently.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Vibratory Pile Driver, Mobile Truck Crane
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: A.Md. MUHAMMAD AGHA FIRMANSYAH
Date Deposited: 31 Aug 2020 03:04
Last Modified: 31 Aug 2020 03:04
URI: https://repository.its.ac.id/id/eprint/81547

Actions (login required)

View Item View Item