Items where Subject is "TH900+ Construction equipment in building construction"

Group by: Creators | Item Type
Jump to: A | B | E | H | I | K | M | N | R | S | T | W | Y
Number of items at this level: 16.

A

Abrinaldi, Farah Hidayati and Kinanti, Maharani Heyna (2022) Laporan Kerja Praktik Proyek Apartemen Urban Signature – LRT City Ciracas Jakarta Timur. Project Report. [s.n.], [s.l.]. (Unpublished)

Alfiansyah, Afif Argadipa (2021) Estimasi Waktu Dan Biaya Pekerjaan Erection Girder Dengan Metode Launcher Pada Overpass Proyek Jalan Tol Pasuruan Probolinggo Sta 29 + 325. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Arthando, Samuel Gogo and Mahardika, Rozzy De Alfedo (2021) Proyek Pembangunan Apartemen Sky House Alam Sutera Tangerang. Project Report. [s.n.]. (Unpublished)

B

Beltsanda, Carel and Ridwan, Mohammad Rizqi (2021) Laporan Kerja Praktik Proyek Cisauk Point Apartment Banten. Project Report. [s.n.]. (Unpublished)

E

Erlangga, Tubagus Moch. Satria (2016) Perencanaan Sistem Penanganan Bagasi Pada Terminal 1b Di Bandar Udara Internasional Juanda Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember Surabaya.

H

Halomoan, Christophorus Ageng (2020) Desain Pile Installer Barge untuk Menunjang Proyek Pembangunan Lamongan Oil Tank Terminal (LOTT). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

I

Islami, Zahara Elfira Nur (2021) Evaluasi Sarana Tanggap Darurat Kebakaran Berdasarkan Potensi Kebakaran Pada Gedung Pusat Perbelanjaan (Studi Kasus: Pusat Grosir Surabaya). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

K

Kusumanto, Gusti Rizky (2016) Optimasi Lokasi Untuk Penempatan Group Tower Crane Pada Proyek Ciputra World 2 Office Tower Jakarta. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

M

Mahfida, Lely (2021) Rancang Bangun Sistem Kontrol Motor Pompa Ulir Pada 3d Printing Untuk Mengatur Output Mortar Menggunakan Metode Fuzzy Logic Control. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

N

Nilamsari, Nilamsari and Putri, Amirahhanan Shiyamirahmah (2021) Laporan Kerja Praktek Proyek Pembangunan Bintaro Jaya Xchange Mall Tahap II. Project Report. [s.n.], [s.l.]. (Unpublished)

R

Rahaditya, Verdi Arya (2021) Beton Hijau 3D Printing Berbahan dasar Fly Ash dan Lumpur Sidoarjo. Other thesis, Institut Teknologi Sepuluh Nopember.

S

Sinatriya, Nandaffa (2021) Perhitungan Waktu Dan Biaya Pelaksanaan Pembangunan Gedung Rumah Sakit Islam Surabaya Dengan Metode Konstruksi Half Slab. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

T

Thayeb, Muhammad Annas (2015) Pemilihan Alat Berat Pada Pekerjaan Tanah Proyek Pembangunan packing Plant Pt. Semen Indonesia Di Balikpapan. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

W

Wiradarma, Kukuh Putra (2021) Metode Pelaksanaan Pada Proyek Pembangunan Binus School Semarang. Project Report. [s.n.], [s.l.]. (Unpublished)

Y

Yovianto, Muhammad Derizky (2023) LAPORAN KEGIATAN MAGANG PROGRAM MAGANG MANYAR SMELTER PROJECT GRESIK-JAWA TIMUR. Project Report. [s.n], [s.l.]. (Unpublished)

Yudo, Niko Zardi (2016) Perencanaan Alternatif Struktur Jembatan Damas-Trenggalek Menggunakan Box Girder Prestressed Segmental. Undergraduate thesis, Institut Teknologi Sepuluh Nopember Surabaya.

This list was generated on Sat Apr 1 17:40:47 2023 UTC.