Items where Division is "21401-(D3) Diploma 3" and Year is 2014
Conference or Workshop Item
HAKIM, MUHAMMAD LUKMAN (2014) PENYUSUNAN STANDAR OPERASIONAL PROSEDUR PERAWATAN POMPA BANJIR DENGAN METODE BREAKDOWN MAINTENANCE : KASUS KHUSUS REWINDING MOTOR LISTRIK. In: Final Assignment Mechanical Engineering, D III STUDY PROGRAM MECHANICAL ENGINEERING DEPARTMENT Faculty of industrial Technology.
HAMZAH, AMIR (2014) PENGARUH BUKAAN CEROBONG OVEN TERHADAP KADAR AIR YANG HILANG PADA PROSES PENGERINGAN KULIT SAPI UNTUK BAHAN KRUPUK RAMBAK. In: Final Assignment MECHANICAL ENGINEERING, STUDY PROGRAM DIPLOMA III MECHANICAL ENGINEERING DEPARTEMENT Faculty Of Industrial Technology.
Pramudita, Armeinia (2014) Rancang Bangun Mesin Pencacah Botol Plastik Dengan Skala Industri Rumah Tangga Kapasitas 20 Kg/Jam. In: Final Assignment Mechanical Engineering, STUDY PROGRAM DIPLOMA III Faculty Of Industrial Technology. (Unpublished)
Thesis
ANANG, FIRMANSYAH (2014) STUDI NUMERIK MEDAN ALIRAN PADA BODI MOBIL NOGOGENI 4. Diploma thesis, Institut Teknologi Sepuluh Nopember.
ANGGA, SETIAWAN (2014) PERENCANAAN PROSEDUR STANDAR BREAKDOWN MAINTENANCE POMPA BANJIR DI SURABAYA : PENGGANTIAN IMPELLER DAN BEARING. Diploma thesis, Institut Teknologi Sepuluh Nopember.
Arrasich, Indra Fajar (2014) Perhitungan ulang instalasi kompresor CP9560 pada Central Procesing Area ( Cpa ) Job Pertamina-Petrochina East Java Tuban. Diploma thesis, Institut Teknologi Sepuluh Nopember.
Azmi, - (2014) PERENCANAAN MEKANISME GERAKAN PENCAMPURAN BERAYUN MESIN REAKTOR HIDROLISIS KAPASITAS 3 LITER. Diploma thesis, Institut Teknologi Sepuluh Nopember.
Dewi, Diana Kumara (2014) Perhitungan Unjuk Kerja Turbin Gas Solar Saturn Pada Unit Pembangkit Daya Joint Operating Body Pertamina - Petrochina East Java (JOB P-PEJ). Diploma thesis, Insititut Teknologi Sepuluh Nopember.
EKSAMINANTA, RIJAL PRATAMA (2014) BANGUN & ANALISA MESIN SOSOH BERAS DENGAN MENGGUNAKAN METODE SCREW CONVEYOR YANG DI MODIFIKASI UNTUK MENGHASILKAN BERAS SIAP MASAK DENGAN KANDUNGAN NUTRISI TINGGI. Diploma thesis, INSTITUT TEKNOLOGI SEPULUH NOPEMBER.
FUAD, APRILIA CHOIRUL LATHIFAH (2014) PERENCANAAN BEBAN PENDINGINAN PADA KABIN PESAWAT BOEING 737-300 (B737-300). Diploma thesis, Institut Teknologi Sepuluh Nopember.
Fachrudin, Imam Nur (2014) Perhitungan ulang (Manual & Numerik) Crude Oil Booster Pump pada CPA Pertamina Petrochina Tuban. Diploma thesis, Institut Teknologi Sepuluh Nopember.
Fahmi, Erwinsyah (2014) Analisa Numerik Struktur Tabung LPG dan CNG serta Rancang Bangun Sensor Gas. Diploma thesis, Institut Teknologi Sepuluh Nopember.
HAKIM, MUHAMMAD LUKMAN (2014) PENYUSUNAN STANDAR OPERASIONAL PROSEDUR PERAWATAN POMPA BANJIR DENGAN METODE BREAKDOWN MAINTENANCE : KASUS KHUSUS REWINDING MOTOR LISTRIK. Diploma thesis, Institut Teknologi Sepuluh Nopember.
HALWAN, FARICH FIRMANSYAH (2014) ANALISIS PENGARUH OVERLAP RATIO PADA TURBIN ANGIN SUMBU VERTIKAL SAVONIUS MENGGUNAKAN PERANGKAT LUNAK FLUENT 6.3.26. Diploma thesis, Institut Teknologi Sepuluh Nopember.
HAMZAH, AMIR (2014) PENGARUH BUKAAN CEROBONG OVEN TERHADAP KADAR AIR YANG HILANG PADA PROSES PENGERINGAN KULIT SAPI UNTUK BAHAN KRUPUK RAMBAK. Diploma thesis, Institut Teknologi Sepuluh Nopember.
Herviando, Aryo K.W. (2014) Perhitungan beban pendingin pada kabin pesawat Airbus 330-300. Diploma thesis, Insititut Teknologi Sepuluh Nopember.
IFANDEA, REZA (2014) RANCANG BANGUN DAN PERENCANAAN SISTEM TRANSMISI PADA MESIN PENGUPAS BATOK KELAPA BERKAPASITAS 59 BUAH/JAM. Diploma thesis, INSTITUT TEKNOLOGI SEPULUH NOPEMBER.
Imanuddin, Muhammad Teguh (2014) Pengembangan Sistem Kontrol Elektropneumatik Percobaan 11-20 Berbasis PLC Dengan Menggunakan Festo PLC FEC-FC34. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Indrawan, Wahyu (2014) Analisis perbandingan Tekanan Turbin Angin Savonius Split Tipe – U Standard dengan Turbin Angin Savonius Tipe - U Modifikasi Back Guide dan Front Guide menggunakan Perangkat Lunak Fluent 6.3.26. Diploma thesis, Institut Teknologi Sepuluh Nopember.
Irodat, Qalam and Gendrowati, Suci Wuri (2014) Rancang Bangun Mesin Pengerol Sandal Dengan Kapasitas 360 Buah Sandal/Jam. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Jiantoro, Aris (2014) Kajian Dan Modifikasi Struktur Mekanik Mesin Simulator CNC Servo System. Diploma thesis, Insititut Teknologi Sepuluh Nopember.
MASHUDA, MASHUDA (2014) KAJIAN OPTIMASI UNJUK KERJA MOTOR DC SEPEDA MOTOR LISTRIK ROJO GENI DENGAN METODE REWIRING DAN RECOILING PADA KONDISI STASIONER. Diploma thesis, INSTITUT TEKNOLOGI SEPULUH NOPEMBER.
MUSYFIQ, ABDUL AZIZ and ADAM, ABEL BRYAN (2014) RANCANG BANGUN MESIN PEMOTONG KACA BENTUK SILINDER DENGAN MEKANISME ENGINE LATHE. Diploma thesis, Institut Teknologi Sepuluh Nopember.
Masyruhin, Muhammad (2014) Analisa Pengaruh Variasi Lipatan Pada Komposit Lamina Terhadap Sifat Mekanik Dan Struktur Mikro Dari Hasil Tempa. Diploma thesis, Insititut Teknologi Sepuluh Nopember.
Mubarot, Ichros Sofil (2014) Perencanaan Mekanisme Dan Analisa Struktur Pada Mesin Power Hammer Untuk Pandai Besi. Diploma thesis, Insititut Teknologi Sepuluh Nopember.
Multazam, Diky (2014) Analisa Pengaruh Perbedaan Interpas Temperatur Pengelasa GTAW Aluminium 6061 Menggunakan Filler ER4043 Terhadap Sifat Mekanik Dan Struktur Mikro. Diploma thesis, Institut Teknologi Sepuluh Nopember.
NASIK, - (2014) RANCANG BANGUN MESIN PEMBERSIH GALON. Diploma thesis, Institut Teknologi Sepuluh Nopember.
Nurdiansyah, Candra (2014) Perbandingan Unjuk Kerja Hasil Simulasi Menggunakan Perangkat Lunak Lotus Engine Simulation V5.6 Pada Motor Bakar Tipe CS 8,5 ST 301 Cc Satu Silinder Single Fuel Gasoline Dan LPG. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
OKI LIYANA, SARI (2014) SISTEM TRANSMISI PADA MESIN PEMOTONG SINGKONG UNTUK KERIPIK BERKAPASITAS 80KG/JAM. Diploma thesis, Institut Teknologi Sepuluh Nopember.
PRAMUDITA, ARMEINIA (2014) RANCANG BANGUN MESIN PENCACAH BOTOL PLASTIK DENGAN SKALA INDUSTRI RUMAH TANGGA KAPASITAS 20 KG/JAM. Diploma thesis, Institut Teknologi Sepuluh Nopember.
PUTRA, JANU HADI (2014) PERENCANAAN DAN KAJIAN NUMERIK STRUKTUR KAPAL SELAM NIR AWAK (AUTONOMOUS UNDERWATER VEHICLE/AUV). Diploma thesis, Institut Teknologi Sepuluh Nopember.
Purnama, Ardhian Dwi Candra (2014) Perencanaan Gaya dan Daya Mesin Pemotong Singkong untuk Pembuatan Keripik Berkapasitas 80 Kg/Jam. Diploma thesis, Institut Teknologi Sepuluh Nopember.
RISHAD ANTONY, PRATAMA (2014) ANALISA STRUKTUR RANGKA ATAS DAN BAWAH PADA MESIN PENCETAK PELET IKAN DENGAN MENGGUNAKAN SOFTWARE ANSYS 12.1. Diploma thesis, Institut Teknologi Sepuluh Nopember.
Rakhmadi, Taufiqur (2014) Perencanaan Ulang Instalasi Crude Oil Booster Pump Di CPA Pertamina Petrochina Tuban Jawa Timur. Diploma thesis, Insititut Teknologi Sepuluh Nopember.
SAPUTRA, HERU BAYU and HERNANDITA, ARDIAS KURNIAWAN (2014) RANCANG BANGUN MESIN PENCETAK BIJI PLASTIK DAUR ULANG KAPASITAS 1,7 KG/JAM DENGAN MEKANISME SQUEEZE. Diploma thesis, Institut Teknologi Sepuluh Nopember.
SETYAWAN, HERU (2014) RANCANG BANGUN DAN PERENCANAAN GAYA DAN DAYA PADA MESIN PENGUPAS BATOK KELAPA BERKAPASITAS 59 BUAH/JAM. Diploma thesis, INSTITUT TEKNOLOGI SEPULUH NOPEMBER.
Sholichuddin, Mochammad (2014) Perbedaan Sifat Mekanik Hasil Penyambungan Las GTAW Pada Aluminium 6061 Dengan Filler ER4043 Dan ER5356. Diploma thesis, Institut Teknologi Sepuluh Nopember.
Sucipto, Guntur Agus (2014) Simulasi Perbandingan Unjuk Kerja Motor Bakar Torak CS4 123 CC Berbahan Bakar Gasoline Dan LPG Menggunakan Software Lotus Engine Simulation. Diploma thesis, Insititut Teknologi Sepuluh Nopember.
Sucipto, Guntur Agus (2014) Simulasi Perbandingan Unjuk Kerja Motor Bakar Torak Cs4 123 Cc Berbahan Bakar Gasoline Dan Lpg Menggunakan Software Lotus Engine Simulation. Diploma thesis, Institut Teknologi Sepuluh Nopember Surabaya.
Suwidyanto, Setyo (2014) Perhitungan Sistem Transmisi Mesin Rol Pelengkung Pipa Galvanis Berdiameter 1 1/4 Inchi. Diploma thesis, Institut Teknologi Sepuluh Nopember.
TRIARYOSI, URANDY (2014) PERENCANAAN DESAIN MESIN REAKTOR HIDROLISIS DENGAN KAPASITAS 3 LITER DENGAN MEKANISME POROS BERPUTAR SECARA HORIZONTAL. Diploma thesis, Institut Teknologi Sepuluh Nopember.
WIDODO, BUYUNG PRASETYO and DHEWA, RYANTHA BAGUS PUTRA (2014) RANCANG BANGUN (FENCE BENDER) MESIN BENDING PEMBUATAN PROFIL SIKU DAN MELINGKAR DENGAN DIAMETER DALAM 50MM UNTUK KOMPONEN TERALIS DENGAN PELAT TEBAL MAKSIMAL 4MM. Diploma thesis, Institut Teknologi Sepuluh Nopember.
Wardani, Angelia Hermiati Ayu and Fauzi, Alfan (2014) Rancang Bangun Mesin Roll Bendingplat Akrilik (Poly Methylmethacrylate). Diploma thesis, Institut Teknologi Sepuluh Nopember.
Wijaya, Richard Wachju (2014) Rancang Bangun Mesin Pemotong Singkong Menggunakan Meja Translasi Dengan Penggerak Pedal Kaki. Diploma thesis, Insititut Teknologi Sepuluh Nopember.
Wildania, Ridha and Perwira, Mada (2014) Rancang Bangun Mesin Drill Dengan 6 Spindel Untuk Proses Pelubangan Sandal. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.