Items where Subject is "T Technology > TH Building construction > TH438 Construction industry--Management. Project management."

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: - | A | B | C | D | E | F | G | H | I | K | L | M | N | P | Q | R | S | T | U | W | Y | Z
Number of items at this level: 93.

-

-, Yomelda (2015) Analisa Earned Value Terhadap Biaya dan Waktu Pada Proyek Pembangunan Vimala Hills Villa & Resort Bogor. Undergraduate thesis, Institut Technology Sepuluh Nopember.

A

Aanval, Yelestya (2018) Faktor Kritis Kesuksesan Hubungan Kerja Antara Kontraktor Utama Dan Subkontraktor Pada Perusahaan Konstruksi Baja. Masters thesis, Institut Teknologi Sepuluh Nopember.

Adam, Affan Safani (2021) Estimasi Waktu dan Biaya Pelaksanaan Gedung Main Office PT Mega Surya Mas Sidoarjo Dengan Konstruksi Halfslab. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Adiputra, Lukas (2021) Analisis Highest and Best Use (HBU) Pada Lahan Di Jalan Gatot Subroto Kota Tangerang. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Aisyah, Salwa Devi (2021) Perhitungan Waktu dan Biaya Pelaksanaan Proyek Pembangunan Gedung Apartemen Klaska Residence Tower Azure Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Alfiatrianti, Nia (2005) Perencanaan Metode Pelaksanaan Tower 333 Meter. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Alrizal, Fahmi Firdaus (2016) Analisis Model Penerimaan Teknologi Terhadap Implementasi Green Construction Pada Proyek Grand Sungkono Lagoon Surabaya. Masters thesis, Institut Teknologi Sepuluh Nopember Surabaya.

Andhika, Gregorius (2020) Optimasi Waktu dan Biaya Pada Proyek Apartemen Grand Dharmahusada Lagoon Surabaya Tower Olive. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Andrean, Stevie (2018) Analisis Pengaruh Faktor Penyebab Non-Excusabe Delay Pada Proyek Konstruksi Gedung Di Manado. Masters thesis, Institut Teknologi Sepuluh Nopember.

Ariyanti, Zhagita Devie (2018) Perencanaan Metode Pelaksanaan Pekerjaan Bekisting Pada Proyek Hotel Lifestyle Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

B

Bahri, Khaerul (2018) Penerapan Rekayasa Nilai (Value Engineering) Pekerjaan Arsitektural Pada Pembangunan Proyek Transmart Carrefour Padang. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Bahtiar, Mohamad Yusuf (2018) Analisa Perbandingan Waktu Dan Biaya Pada Proyek Pembangunan Tol Mojokerto - Kertosono Seksi 2 STA 5+000 - 24+900. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Betamal, Fendy Nur (2015) Analisa Life Cycle Cost Perkerasan Kaku Dan Lentur Jalan Nasional (Studi Kasus: Jalan Batas Kota Bojonegoro-Padangan). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

C

Christarindra, Steffanie (2020) Analisis Penyebab Keterlambatan Proyek Pembangunan Tower Caspian Grand Sungkono Lagoon. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Cittopacama, Bima Wira Kumara (2021) Implementasi Program Keselamatan Dan Kesehatan Kerja (K3) Pada Proyek Konstruksi Gedung Di Kota Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

D

Darmawan, Rahmat Ridho (2018) Simulasi Operasi Konstruksi Pekerjaan Beton Pada Proyek Hotel Dafam Kayon Surabaya Menggunakan Cyclone. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Dzakiyah, Hasna (2021) Perbaikan Desain Stasiun Kerja Pada Pabrikasi Tulangan Baja Melalui Pendekatan Ergonomi (Studi Kasus : Proyek Cibitung-Cimanggis Tollways Seksi 2). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

E

Erba, Tifany (2018) Rencana Kesehatan dan Keselamatan Kerja Kontrak (RK3K) Pada Pembuatan Basement Dengan Menggunakan Metode Hazard Identification Risk Asessement And Risk Control (HIRARC) Yang Mengacu Pada Bangunan Green Building Pada Proyek Pembangunan The Samator Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

F

Faisal, Fahmi (2017) Analisis Faktor Utama Yang Mempengaruhi Waktu Pelaksanaan Proyek Pembangunan Infrastruktur LRT (Light Rail Transit) Jabodebek. Masters thesis, ITS.

Farrasi, Abyan and Krisnadinata, Alby (2021) Tutorial Pembuatan Rencana Anggaran Biaya Dan Penjadwalan Proyek (Contoh Proyek Penambahan Lantai Gedung Belakang Inspektorat Sumenep). Project Report. [s.n.]. (Unpublished)

Firmansyah, Muhammad Agha (2020) Estimasi Biaya Dan Waktu Serta Metode Pelaksanaan Proyek Rehabilitasi Waduk Muara Nusa Dua Kota Denpasar, Bali. Diploma thesis, Institut Teknologi Sepuluh Nopember.

Firnadi, Yanuarche (2020) ANALISIS PERBANDINGAN METODE BOTTOM-UP DAN TOP-DOWN MENGGUNAKAN BEKISTING KONVENSIONAL DAN BEKISTING GANTUNG PADA PROYEK APARTEMEN OSAKA PIK 2 TANGERANG. Undergraduate thesis, INSTITUT TEKNOLOGI SEPULUH NOPEMBER.

G

Gayatri, Ajeng (2021) Estimasi Biaya, Waktu dan Metode Pelaksanaan Menggunakan Metode Launcher Girder Pada Jembatan Kali Sumantri STA 441 + 425 Sampai Dengan STA 441 + 762 Pada Proyek Jalan Tol Batang Semarang Seksi 4. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Ghullam, Arif Abadil (2020) Model Prediksi Waktu Penyelesaian Proyek Pada Kegiatan Usaha Hulu Migas Menggunakan Support Vector Regression Growth Model. Masters thesis, Institut Teknologi Sepuluh Nopember.

H

Hardianto, Hardianto (2021) Perhitungan Waktu Dan Biaya Pelaksanaan Pembangunan Gedung Parkir Kampus B Universitas Airlangga Surabaya Menggunakan Precast Half Slab. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Hermanto, Julius Arie (2005) Analisa Perbandingan Pertukaran Waktu Dan Biaya Menggunakan Metode TCTO Dan Simulasi Probabilistik. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Hermawan, Agung. T (2005) Peningkatan Pengendalian Mutu Pengadaan Bahan Bagi Proyek Pembangunan Pabrik Chlorine Dioxide PT. Indah Kiat Pulp & Paper ( PT. IKPP ) Lokasi Perawang- Propinsi Riau Berdasarkan Standar ISO 9001: 2000. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Hidayat, Moh Ardian (2018) Perhitungan Biaya dan Waktu Pelaksanaan Pembangunan Gedung Pascasarjana Universitas Muhammadiyah Malang (UMM). Undergraduate thesis, institut teknologi sepuluh nopember.

I

Imayanti, Basari (2017) Estimasi Risiko Proyek High Rise Building Pada Kontraktor. Masters thesis, ITS.

Inprasetyobudi, Hery (2015) Studi Pengembangan Model Strategi Operasi Pembangunan Kapal Berbasis Fasilitas Produksi. Masters thesis, Institut Teknologi Sepuluh Nopember.

Irbinanto Subakti, IRBINANTO SUBAKTI (2021) Manajemen Risiko Pembangunan Bangunan Gudang Dan Bangunan Operasional Perakitan Detonator: Di Sebuah Perusahaan Tambang. Masters thesis, FACULTY OF CREATIVE DESIGN AND DIGITAL BUSINESS SEPULUH NOPEMBER INSTITUTE OF TECHNOLOGY.

Isa, Muhammad Hidayat (2015) Konsep Pengembangan Transit Oriented Development Di Kawasan Transit Stasiun Sidoarjo. Masters thesis, Institut Teknology Sepuluh Nopember.

K

Kristiawan, Freedy (2021) Penilaian Kriteria Sukses Proyek Kerjasama Pemerintah Dengan Badan Usaha (Kpbu) Pada Proyek Jalan Tol Di Indonesia. Masters thesis, Institut Teknologi Sepuluh Nopember.

Kurnianingsih, Bibit (2014) Analisa teknik dan finansial investasi proyek pembangunan dermaga petikemas untuk memenuhi peningkatan kebutuhan perusahaan PT.Pelabuhan Indonesia III (Persero) cabang Banjarmasin. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Kurniawan, Ariq Rosodela (2021) Rencana Perhitungan Waktu, Biaya, Dan Pelaksanaan Pembangunan Gedung Prasarana Pendidikan Profesi Guru UNESA Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Kurniawan, Ilham and ., Ulfiatussofa (2018) Perencanaan Pelaksanaan Pembangunan Struktur Gedung Fakultas Ekonomi Bisnis Islam (FEBI) Universitas Islam Negeri Sunan Ampel Surabaya. Diploma thesis, Institut Teknologi Sepuluh Nopember.

Kurniawan, Yoni Pamudra (2003) Penerapan Rekayasa Nilai Pada Proyek Pembangunan Gedung Rawat Inap Pavilyun RSUD Dr. Soetomo Surabaya Tahap IV. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Kusuma, Rafael Dani (2020) Produktivitas Maksimum Penggunaan Lahan Dengan Metode Highest And Best Use (HBU) Pada Lahan Parkir Motor Mall. Masters thesis, Institut Teknologi Sepuluh Nopember.

Kusumawardani, Maria Dyah Pramesthi and Chaullah, Abyanza (2021) Laporan Tugas Pengganti Kerja Praktek : Tutorial Pengendalian Waktu dan Biaya Proyek Menggunakan Metode Earned Value. Project Report. [s.n.]. (Unpublished)

L

Lubis, M. Riski Imansyah (2016) Perbaikan Proses Konstruksi Pembangunan Pipa Gas Dengan Penerapan Metode Lean Construction Untuk Mereduksi Waste (Studi Kasus Proyek Pembangunan Pipa Gas Pertamina Porong – Grati). Masters thesis, Institut Teknologi Sepuluh Nopember.

Ludfi, Risma Indriya (2018) Analisis Deformasi Vertikal Bangunan Bertingkat Kampus ITS Sukolilo Menggunakan Metode Terestrial. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

M

M. Eza, Putri Cinto Buliah (2020) Analisis Supply Chain Sektor Konstruksi Di Indonesia dengan Pendekatan Inter-Regional Structural Path Analysis Berbasis Matriks Input-Output. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Maromi, Muhammad Izeul (2015) Analisa Kinerja Biaya Dan Waktu Pelaksanaan Pada Proyek Pembangunan Condotel De Vasa Surabaya Menggunakan Metode Earned Value. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Muniroh, Zuhrotul (2020) Perhitungan Waktu dan Biaya Pelaksanaan pada Proyek Perkantoran dan Perkuliahan Tahap IV Universitas Wijaya Kusuma Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

N

Naufal, Muhammad Faris (2020) Perhitungan Waktu dan Biaya Pelaksanaan Pembangunan Swiss-belhotel Solo dengan Modifikasi Sistem Precast Half Slab. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Nolasari, Annisa Binti (2020) Estimasi Waktu Dan Biaya Pelaksanaan Proyek Pembangunan Jembatan Sungai Jambe Jalan Tol Cibitung - Cilincing STA 11+400 - STA 11+500. Undergraduate thesis, Institut Teknologi Speuluh Nopember.

P

Paundra, Dhimas Bagus Prayudhi (2021) Perencanaan Sistem Manajemen Keselamatan Konstruksi (SMKK) Pada Pekerjaan Erection Girder Proyek Jalan Tol Pekanbaru - Dumai Seksi 6IC Ramp 3 Dengan Metode Hirarc. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Prasaja, Setia Dini (1998) Optimasi Biaya Proyek Rumah Sakit Pondok Lndah ( Rspi ) Jakarta Dengan Mempercepat Kurun Waktu Pelaksanaan. Undergraduate thesis, Institut Teknologi Sepuluh Nopember Surabaya.

Prasetyo, Ryan Faza (2015) Analisis Faktor Persepsi Kesadaran Dan Kesiapan Kontraktor Di Surabaya Menghadapi Masyarakat Ekonomi ASEAN. Masters thesis, Institut Technology Sepuluh Nopember.

Pratama, Bayu Putra and Tawakkal, Alfath (2018) Metode Pelaksanaan Bendungan Pengelak (Cofferdam) Bagian Hulu Pada Proyek Pembangunan Waduk Bendo, Ponorogo. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Prawidiawati, Fitri (2015) Analisa perbandingan metode bottom-up dan metode top-down pekerjaan basement pada gedung parkir apartemen skyland city education park bandung dari segi biaya dan waktu. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Punjungsari, Dwi Nova (2021) Analisis Waktu dan Biaya Pelaksanaan Proyek Pembangunan Apartemen Royal Sentul Park Dengan Modifikasi Precast Half Slab Pada Lantai 8 - 15. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Purwanto, Prasetyo Hari and Firmansyah, Erdin (2018) Metode Pelaksanaan dan Estimasi Biaya Pembuatan Intake Pada waduk Bendo, Kabupaten Ponorogo-Jawa Timur. Diploma thesis, Institut Teknologi Sepuluh Nopember.

Putra, Abiyyu Pratama and Al Rezza, Arlo (2021) Laporan Kerja Praktek Proyek Pembangunan Gedung BCA KCU Bukit Darmo Surabaya. Project Report. [s.n.]. (Unpublished)

Q

Qaedi, Hafizhan and Gusti, Riski Nugrahaning (2021) Laporan Kerja Praktek Pada Proyek Pembangunan Pasar Legi Songgolangit Ponorogo,. Project Report. [s.n]. (Unpublished)

R

Rahaditya, Verdi Arya and Bhaskara, Ida Bagus Abirama (2020) Tutorial Pemodelan, Perhitungan Volume, dan Biaya Menggunakan Revit 2018. Project Report. [s.n]. (Unpublished)

Rahman, Riky Regannaldo Fajar (2015) Penerapan analisa time cost trade off pada proyek pembangunan V-Boutique Hotel Bandung. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Ratnaningsih, Anik (2012) Pengembangan Model Keselarasan Strategi Proyek Dengan Strategi Bisnis Usaha Jasa Konstruksi Di Indonesia. Doctoral thesis, Institut Teknologi Sepuluh Nopember.

Ridhoh, Risas Romadhon (2018) Penerapan Value Engineering Terhadap Struktur Pelat Lantai Menggunakan Half Slab Precast Pada Lantai 3-25 Proyek Gedung Tower 1 Apartemen Tamansari Mahogany. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Rivai, Feisal Rajab (2021) Kerangka Penilaian Keberlanjutan Sosial Pada Apartemen. Masters thesis, Institut Teknologi Sepuluh Nopember.

S

S., Moch. Ricky Efendi (2016) Perbandingan Biaya Dan Waktu Antara Stuktur Baja Pembangunan Gudung Ruang Kuliah Universitas Trunojoyo Madura. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Samino, Arche Dorea Eirene (2020) Perancangan Manajemen Proyek Pembuatan Rotary Restraining Box yang meliputi Desain Detail, Fabrikasi, Instalasi, dan Commissioning untuk Rumah Potong Hewan Pemkab Tuban. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Saputra, Kurniadi (2018) Perencanaan Biaya dan Penjadwalan Pada Pembangunan Apartemen Taman Sari Mahogany Karawang (Tower A). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Saputra, Rio (2015) Pengaruh green supply chain management terhadap kinerja biaya pada perusahaan konstruksi dengan pendekaran sistem dinamis. Masters thesis, Institut Teknologi Sepuluh Nopember.

Saputri, Rengganing Sasanti Mergi (2018) Perencanaan Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) Pada Pembangunan Struktur Atas Gedung SOHO PT. Samator Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Saragih, Hansel Samuel Eiros (2017) Analisis Rework terhadap Biaya pada Proyek Pembangunan Apartemen Gunawangsa Tidar Surabaya dengan Metode Fault Tree Analysis (FTA) dan Expected Monetary Value (EMV). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Sari, Feby Kartika (2015) Analisa Pengaruh Faktor Pelaksanaan Terhadap Kinerja Biaya Proyek Konstruksi Gedung Di Surabaya. Masters thesis, Institut Technology Sepuluh Nopember.

Sasongko, Tonny Rizkya Nur (2018) Pengaruh Peran Project Management Office (PMO) Terhadap Kinerja Proyek Infrastruktur Ketenagalistrikan. Masters thesis, Institut Teknologi Sepuluh Nopember.

Savira, Farah (2018) Perhitungan waktu dan biaya pelaksanaan struktur pada proyek pembangunan Apartemen Taman Melati @Merr Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Setya, Renza Tri (2020) Analisa Sistem Manajemen Keselamatan Konstruksi (SMKK) Dan Biayanya Pada Struktur Bangunan Atas Proyek Perkantoran Dan Perkuliahan Tahap IV Universitas Wijaya Kusuma Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Shoffan Abdi Tunggal, shoffan (2020) Analisis penentuan mitgasi risiko fase konstruksi proyek penggantian panel kendali sdv dilapangan migas lepas pantai madura. Masters thesis, Institut Teknologi Sepuluh Nopember.

Simangunsong, Sanna O. (2021) Tantangan Dalam Implementasi Kerjasama Pemerintah Dengan Badan Usaha (KPBU) Di Indonesia. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Sopaheluwakan, Mahendra Perdana (2020) STRATEGI ADOPSI DAN IMPLEMENTASI BUILDING INFORMATION MODELING (BIM) DI INDONESIA. Masters thesis, Institut Teknologi Sepuluh Nopember.

Sulistiyo, Ganda (2021) Improvement Terhadap Keterlambatan Pada Proyek Pabrik Garam Camplong Dengan Menggunakan Lean Six Sigma For Construction. Masters thesis, Institut Teknologi Sepuluh Nopember.

Suprapto, Akhbar Ariefianto (2020) Analisis Penyebab Terjadinya Variation Order Pada Proyek X Di PT. XYZ. Masters thesis, Institut Teknologi Sepuluh Nopember.

Suprayogi, Dohri and Yuliansa, Rahmat (2018) Metode Pelaksanaan Main Dam Bendungan Tukul Kabupaten Pacitan, Jawa Timur. Diploma thesis, Institut Teknologi Sepuluh Nopember.

Suselly, Elen (2005) Identifikasi Dan Respon Resiko Pada Pelaksanaan Proyek Gedung Di Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Sutrisna, Akhmad Reza (2018) Analisis Perbandingan Waktu Dan Biaya Metode Top-Down Dan Bottom-Up Pada Apartemen Grand Dharmahusada Lagoon. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

T

Tanujaya, Putra (2020) PEMODELAN MATEMATIS UNTUK MEREDAM FLUKTUASI KEBUTUHAN ALAT BERAT PROYEK. Masters thesis, Institut Teknologi Sepuluh Nopember.

Tardok, Eigar Lamgok (2018) Analisis Percepatan Waktu Menggunakan Metode CPM dan PERT pada Proyek Pembangunan Dermaga Pelabuhan Tanjung Priok. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Taufik, Mohamad. H (2002) Analisa Biaya, Waktu Dan Metode Pelaksanaan Pekerjaan Dinding Diaphragma Dengan Sistem Beton Pracetak Dan Cor Setempat (Studi Kasus Proyek Jalan Under Way Tanah Abang Jakarta). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Thohir, Musa Mardwiana (2020) Optimasi Waktu Pelaksanaan Proyek Swakelola pada Program Percepatan Peningkatan Tata Guna Air Irigasi (P3-TGAI). Masters thesis, Institut Teknologi Sepuluh Nopember.

U

Ulfauzi, Zaki (2020) Penerapan Algoritma Blocplan Sebagai Metode Desain Terminal Regasifikasi Gas Alam Cair (LNG). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

W

Walidonna, Alivia (2020) PENJADWALAN & PENGENDALIAN PROYEK DESAIN LANSEKAP PARIWISATA MENGGUNAKAN CRITICAL CHAIN PROJECT MANAGEMENT (CCPM). Masters thesis, Institut Teknologi Sepuluh Nopember.

Widaryanto, Benny (2003) Analisa Optimasi Pengendalian Material Pada Proyek Gedung Kuliah Dan Klinlk Universitas Kristen Petra Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Widianto, Hanny (2005) Pemilihan Peralatan Berat Yang Efisien Terhadap Waktu Dan Biaya Pada Proyek Pembangunan Fakultas Hukum Universitas Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Widodo, Aristawati Dhiyan (2018) Monitoring Perhitungan dan Pengelompokan Barang di Konveyor Berdasarkan Kode Batang (Scanner Barcode) Melalui LCD. Diploma thesis, Institut Teknologi Sepuluh Nopember.

Widowati, Elok Dewi (2021) Pemodelan Work Rate Pada Proyek Konstruksi Gedung Di Surabaya Dengan System Dynamic Untuk Mengoptimumkan Kinerja Biaya Dan Waktu. Masters thesis, Institut Teknologi Sepuluh Nopember.

Wihardjo, Widyanto (2001) Analisa Aspek·Aspek Teknis Yang Menyebabkan Keterlambatan Pelaksanaan Suatu Proyek (Studi Kasus Pada Proyek Pembangunan Gedung Fasilitas Dan Serbaguna Unpar). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Wijaya, Dafid Purnama and Sumartono, Vicky Tri Setya (2014) Studi perbandingan kinerja struktur bangunan beton bertulang bertingkat 4 tahan gempa antara metode Sistem Rangka Pemikul Momen Menengah (SRPMM) dan Sistem Rangka Pemikul Momen Khusus (SRPMK). Diploma thesis, Institut Teknologi Sepuluh Nopember.

Wisudanto, Agus Wibowo (2013) Faktor-Faktor Penyebab Keterlambatan Pada Proyek Konstruksi Gedung Di Kediri. Masters thesis, Institut Teknologi Sepuluh Nopember.

Y

Yarisetouw, Hansen Thomas (2015) Identifikasi Pelanggaran Etika Proyek Konstruksi Dalam Lingkup Proyek Konstruksi Pemerintah Daerah (X). Tinjauan Dari Perspektif: Pemerintah Dan Kontraktor. Masters thesis, Institut Teknologi Sepuluh Nopember.

Z

Zanuardi, Arvian (2018) Pemanfaatan Prinsip Value for Money dalam Penentuan Prioritas Pemeliharaan Jalan Nasional di Perkotaan (Studi Kasus : Jalan Nasional di Wilayah Kota Surabaya. Masters thesis, Institut Teknologi Sepuluh Nopember.

This list was generated on Sun May 16 07:40:58 2021 WIB.